HISTORY

Verusa Holding is founded.

Ata Elektrik Enerjisi Toptan Satış A. Ş. joins the group.

Aldem Çelik Sanayi ve Ticaret A.Ş. joins the group.

Verusaturk Girişim Sermayesi Yatırım Ortaklığı A. Ş. is founded.

Acıselsan Acıpayam Selüloz Sanayi ve Ticaret A. Ş. joins the group.

Verusa Holding shares go public.

Standard Boksit İşletmeleri A. Ş. is founded.

Verusaturk Girişim Semayesi Yatırım Ortaklığı shares go public.

Pamukova Elektrik Üretim A. Ş. is founded for renewable energy investments.

Tortum Elektrik Üretim A.Ş. joins the group. The company owns a 7.49 MW installed capacity hydroelectric power generation plant located in Erzurum province, Senyurt region, on Tortum river.

Verusa Group becomes the largest partner in the stake of Enda Enerji Holding A.Ş. which is an established company in renewable energy sector.

Verusa Holding shares are included in MSCI Global Small Cap Index.

Ata Elektrik A.Ş. purchases 4% of Energy Exchange Istanbul (EXIST) and becomes the 3rd largest partner of EXIST.

Verusa Holding shares are included in BIST Dividend Index (XTMTU).

Kafein Yazılım A.Ş. (venture capital investments of Verusaturk) shares go public.

Smartiks Yazılım shares go public.

Verusa Holding shares are included in FTSE Global Total Cap Index.

The total number of mine sites of Standard Boksit İşletmeleri reach to 22.

The total number of mine sites of Standard Boksit İşletmeleri reach to 24.

Verusa Holding is accepted as a Signatory of the United Nations Global Compact.

Verusa Holding shares are included in Katılım-50 Index.

Galata Altın İşletmeleri A.Ş. is founded.

Verusaturk acquires 50% stake in Core Engage Yazılım A.Ş.

Core Engage founded Zeroone Interactive Yazılım A.Ş.

Pamukova Elektrik Üretim A.Ş. acquires 80% stake in Pamukova Yenilenebilir Elektrik Üretim A.Ş. (PAMEL)

Verusaturk acquires 25% stake in Golive Yazılım Hizmetleri A.Ş.

Verusaturk acquires 10% stake in Probel Bilgisayar Yazılım Donanım San. ve Tic. A.Ş.